“Building Waterloo’s Future”

Road Construction Information

Your Direct Link To Current Waterloo Road Construction Info.  See tabs below.
roadLogoSmaller

 

2019 Edison St & Franklin St

• Project Updates (posted when available)

Contractor Bid Tabulations & Engineer Recommendation

Special Assessment Detail - Engineers Revised Report (after bids received), Feb. 4, 2019

• Construction Schedule (to be determined)

Preliminary Project Plans

Engineering Cost Estimates, November 2018

- Mitch Leisses with Kunkel Enginering Group (the City's engineer) can take your calls or email if you have project input. [(920) 356-9447 x234 or mleisses@kunkelengineering.com ]

Franklin EdisonStSign smaller
 

2019-2025 Road & Utility Improvement Schedule

Road surface rating map - August 3, 2017

2018 46UpdateStreetPlan

 

Be safe in construction zones – thank you.

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save

Save